婷婷久久综合-婷婷久久综合网-婷婷久月-婷婷玖玖-婷婷开心激情-婷婷开心中文字幕

Installation of electric regulating valve precautions

Column:Technical article Time:2017-12-08
Installation of electric regulating valve precautionsElectric regulating valve installation should pay attention to the following aspects:1, the control valve should be installed before the pipeline cleaning...

Installation of electric regulating valve precautions


Electric regulating valve installation should pay attention to the following aspects:


1, the control valve should be installed before the pipeline cleaning, remove dirt and welding slag. After installation, in order to ensure that no impurities remain in the valve body, the valve should also be cleaned again, that is, when the medium should be opened so that all valves open to prevent impurities stuck. After using the hand wheel mechanism, should be restored to the original neutral position.


2, the control valve should generally be mounted vertically, under special circumstances can be tilted, such as the tilt angle is very heavy valve itself should be increased when the support valve protection.


3, the implementing agencies reducer after repair should pay attention to refueling lubrication, low-speed motor generally do not demolition and refueling. Assembly should also check the valve position and valve position opening instructions are consistent.


4, the control valve is a field instrument, requiring ambient temperature should be -25 ~ 60 ℃ range, relative humidity ≤ 95%. Is to install outdoor or high temperature occasions, should take waterproof, cooling measures. A source side to stay away from the vibration source or increase the anti-vibration measures.


5, electric regulating valve electrical part of the installation should be related to electrical equipment construction requirements. In the case of explosion-proof products, they should be installed in accordance with the "Installation Specification for Electrical Equipment in Explosion Hazardous Locations". Such as the scene wire SBH or other six-core or eight core, outer diameter of about Φ11.3mm rubber skin to install cable. Use and maintenance, explosion-proof area is strictly prohibited open cover maintenance and prying open the explosion-proof surface. At the same time do not disassemble knock or injury flameproof surface, after the repair to restore the original flameproof state.


6, the control valve failure or repair of the production process can continue, the control valve should be added bypass pipeline. At the same time should also pay special attention to whether the valve installation position meets the process requirements.


7, the installation of control valve pipe generally not from the surface or plate is too high, the pipe height is greater than 2m should be set as the platform, in order to facilitate the operation of the hand wheel and easy maintenance.



主站蜘蛛池模板: www.国产福利视频.com | 国产一区二区精品尤物 | 天天插天天射天天操 | 日本一区二区高清免费不卡 | 成人在线网| 国产午夜毛片 | 成年免费视频网站入口 | 激情欧美一区二区三区中文字幕 | 亚洲人成伊人成综合网久久久 | 日本在线视频观看 | 欧美日韩视频在线第一区二区三区 | 久久国产精品99久久久久久老狼 | 日韩第三页 | 国产91丝袜在线播放九色 | 久久亚洲精品国产精品777777 | 日本三级在线 | 精品一二区 | 成年免费大片黄在线观看免费 | 日本一区二区三区久久 | 久久精品亚洲牛牛影视 | 国产日韩在线视频 | 天堂视频网 | 曰批免费视频播放在线看片二 | 在线观看亚洲视频 | 高清欧美性狂猛bbbbbbxxxx | 日韩精品一区二区三区在线观看 | 日日狠狠的日日日日 | 成人欧美深夜福利视频在线播放 | 亚洲邪恶天堂影院在线观看 | 精品国产一区二区三区久久 | 成人免费一区二区三区 | 最近最新中文字幕大全免费7 | 久久88香港三级 | 亚洲网站在线播放 | 中国国产xxxx免费视频 | 日本看片网址 | 综合伊人| 日韩亚射 | 国产人成精品免费视频 | 国产专区一区 | 欧美日韩国产综合视频一区二区三区 |